Ir al contenido

16 de Marzo, 2026

English • Français • Português
Opportimes
  • Comercio Exterior
  • Negocios
    • Empresas
    • Inversiones
    • Oportunidades de Negocio
  • Industria
  • Logística
  • Global
  • Mercados
  • Comercio Exterior
  • Negocios
    • Empresas
    • Inversiones
    • Oportunidades de Negocio
  • Industria
  • Logística
  • Global
  • Mercados
México presidió la Reunión del Grupo de Alto Nivel (GAN) de la Alianza del Pacífico que se llevó a cabo este viernes en Lima, Perú. Mexico chaired the Meeting of the High Level Group (HLG) of the Pacific Alliance held this Friday in Lima, Peru.

Pacific Alliance: Mexico chairs High Level Group Meeting

26 agosto, 2022

Mexico chaired the Meeting of the High Level Group (HLG) of the Pacific Alliance that took place this Friday in Lima, Peru. The meeting was

Leer más »
Construcciones Urales, in association with GAMI Ingeniería e Instalaciones, and AZVI won the tender to build Section 3 of the Tren Maya Project.

Construcciones Urales, GAMI and AZVI win section 3 of the Maya Train

15 mayo, 2020

Construcciones Urales, in association with GAMI Ingeniería e Instalaciones, and AZVI won the tender to build Section 3 of the Tren Maya Project, Fonatur reported.

Leer más »
México presidió la Reunión del Grupo de Alto Nivel (GAN) de la Alianza del Pacífico que se llevó a cabo este viernes en Lima, Perú. Mexico chaired the Meeting of the High Level Group (HLG) of the Pacific Alliance held this Friday in Lima, Peru.

Pacific Alliance: Mexico chairs High Level Group Meeting

26 agosto, 2022

Mexico chaired the Meeting of the High Level Group (HLG) of the Pacific Alliance that took place this Friday in Lima, Peru. The meeting was

Leer más »
Construcciones Urales, in association with GAMI Ingeniería e Instalaciones, and AZVI won the tender to build Section 3 of the Tren Maya Project.

Construcciones Urales, GAMI and AZVI win section 3 of the Maya Train

15 mayo, 2020

Construcciones Urales, in association with GAMI Ingeniería e Instalaciones, and AZVI won the tender to build Section 3 of the Tren Maya Project, Fonatur reported.

Leer más »
  • Política de privacidad
  • Terminos y Condiciones
  • Política de privacidad
  • Terminos y Condiciones

Redacción: 7224059128
info@opportimes.com

Opportimes © Copyright 2026, Todos los derechos reservados.